First of all, the CPK of 2 points of the second machine products valued at around 1, process accuracy and stability is not enough We also use a second machine to produce the same products as the first machine: speed, a second slower than the first, the second 48-50 blow/min, first 70/Min, a lot slower. In addition, CPK, the first CPK values on average are more than 1.33, CPK sent but the second does the same product a lot, some only 0.7 per cent, average only about 1. CPK, please see annex!
翻訳されて、しばらくお待ちください..
