AC3800 10kW 10%V (
2) should have no more than 3 4.1.
1 HT250 1
2 1
3 3 T
3 2 3000 3 Mechanical 3 Mechanical mm 2000
200 2kN
4 4 Mechanical
1 5 2kN
5 3 mechanical servo motor and reducer Japan Panasonic 6 sets of
6 6.7 7 machine die Zhi Shu 3 sets of SAE J826
8 machinery 8 H-point alignment device Chi Shu 3 sets of
9 9 mechanical motor and a speed reducer and Taiwan research 6 sets up, down, left and right, which adjusts the size of the
10 mechanical standard cabinet Zhi Shu 2
11 machinery seat fixture Zhi Shu 3 sets of
12
mechanical
platen Shu Zhi
15
13C measurement of high precision load sensor 6 sets of
14 measurement signal amplifying and conditioning Advantech IPC control instrument Nanjing 6 sets of
15 1
including the monitor
16 analog control acquisition card Ni a PCI6221
16 control encoder counting card of Advantech 1 set PCI1784U
17 in the control simulation output card of Advantech 1 set PCI1723
18 control HP printer companies control a A4 ink-jet
19 drag system Zhi Shu 1
with PLC, switching power supply, a relay
device, circuit breakers, terminal
and
20 test control software Zhi Shu 1
Shanghai Zhi Shu automation -
3 Co., Ltd
- 13) equipment covers an area: 4000 x 30 x 18 (mm).
4.2. installation and commissioning
1) the user should provide adequate testing parts for the commissioning and acceptance;
2) to ensure that the installation and commissioning of the equipment is qualified.
5. operation training1) we are on a 2 day training, training place in our country. Training content includes mechanical
operation, software operation, the attention of security matters and machine maintenance;
2) the user should be sent fixed personnel to participate in the training, I assure users to participate in the training of personnel to complete an independent
1) the training content;
6. random data
1) preparation of parts list and spare parts list;
2) equipment operating instructions (including maintenance).
7. equipment acceptance
1 equipment by our side to the user before, we need to make the customer to our equipment for delivery before the equipment acceptance,
Acceptance test specimen shall be no less than 2 (Times), and we shall be dispatched by the party after acceptance of the customer.
8. service
1) for the final acceptance of the year after year;
2 (
3) in the shelf life except for human factors (user personnel use and operation, no license operation authorization, etc.) or force majeure factors cause the equipment failure, damage, and the rest of the failure and damage of the material costs are from the user's equipment failure, in 8 hours to give solutions (telephone or electronic mail communication), if not resolved my company will send professional maintenance engineers to the scene service;
9.Quotation and delivery time
1) offer: RMB 490000 yuan / Taiwan;
2) delivery cycle: 120 days after the commencement of the contract.